Return to Workshop

Maintenance of Way

Maintenance of Way (MoW) ops is scheduled for Wednesdays – 10:00 a.m. to 12:30 p.m. weather permitting.

Guidelines
No whipper snippers on the top deck please.
Report any issues to Fred or Gene.

No planned routine Maintenance of Way (MoW) for 2020 due to Covid 19.

MoW Log for 2019

May 15, 2019
– Worked on Lily.
– Removed the two structures from Lily. George Wellington has offered to refurnish them. Thanks George.
– Started task of removing weeds.
– Removed switch target for painting.

May 22, 2019
– Worked on Lily.
– More weeding.
– Added two plants where weed removal left bare spots.
– Added ballast where needed.

May 29, 2019

– Worked on Lily. Finished weeding.
– Completed ballasting around Lily.
– Removed debris from between rails.
– Cleaned up patio stones.

June 5, 2019

– rained out

June 12, 2019

– Lawn mowed, weeds trimmed.
– Re-installed painted switch target.
– General track maintenance.
– Weeds removed on Blockhouse spur, track was lifted and re-ballasted.
– Removed weeds at Lily, Bellamy, and below trestles.

June 19, 2019

– Weeds removed, again, at Lily and also at Ironwood, Spruce and Blockhouse. Getting there!
– Weeds trimmed.

June 26, 2019

– Weeds removed on Blockhouse.
– Removed weeds at Lily, and Bellamy.
– Ballasting at Lily.
Too wet after the rain to do anything else.

July 03, 2019

A full crew on hand and then some.

– Weeds removed at Spruce Ironwood, Lily, Blockhouse, Bellamy, Bell.
– Lawn mowed, weeds trimmed. Entrance garden weeded and mulched.
– Ballasting at Ironwood and Spruce.

Both buildings at Lily have been refurbished and are back in place. Thanks, George, for a job well done.

July 10, 2019

Lawn mowed, weeds trimmed.

July 17, 2019

A full crew on hand again. Lots to do with the American Invasion Friday and Saturday.

– Lawn mowed, weeds trimmed.
– Ballasting at Ironwood and Spruce.
– Ballasting at Lily.
– Weeds removed at Spruce Ironwood, Lily, Blockhouse, Bellamy, and Bell.

July 24, 2019

A full crew on hand plus some.

It was such a great day with no rain in the forecast it was time to get some painting done. Got a good start on staining the fascia boards.

– Lawn mowed, weeds trimmed.
– Entrance garden weeded.
– Weeds seem to be holding their own.

July 31, 2019

– Routine grounds and RoW maintenance.
– More painting done despite the rain the day before. Two more sessions may finish it off. Well, the fascia boards anyway.
– Weeds seem to be holding their own.

August 21, 2019

– Worked solo today.
– Note – area needs to be whipper snipped – next week.
– Weeded pretty much the entire layout.
– Added ballast to areas that were low.
– Filled low area at Bellamy.
– Removed debris (small cedar bows and seeds) from track bed near cedars.

August 28, 2019

Rained out.

September 4th, 2019

Back to our fall/spring crew. Thanks summer crew for all the extra help!

– Lawn mowed, weeds whipper snipped/trimmed.
– Weeded the entire layout.
– Added ballast to the east end of Mercer flat.
– Added ballast on Mercer flat double tracking.
– Cleaned up the top deck underneath the cedar (near Mount St.Helen’s) and beech tree (Bellamy Diamond).
– Edged sidewalk in front of crew lounge.

Hopefully next week the painting can continue.