Lily

LillyP

LillyQ

After fire destroyed the smaller wooden trestle at Lily,
IPP&W management decided to replace both wooden trestles with steel bridges.

LillyB

As it was safer and more cost effective to build around the trestles than tear them down, the mainline around Lily will be re-aligned. The new alignment (in yellow) will remove the dog bone (in red) and widen the narrowest curve on the railway.

LillyE

The new main line will bypass both Lily and the Blue Mountain Mine. These areas will be served by the Mattawa and Rat Portage Railway from Glen Hammond. Gord Bellamy, President of the M&RT Railway, is studying the addition to his branch line.

LillyO

The new steel bridges are in place. Two deck girders and a through trestle bridge, shown in the foreground, carry the new mainline around the remaining wooden trestle. The deck girder bridge in the background bypasses the burnt trestle with the realigned mainline.

LillyM

A westward view of the new track alignment at Lily.

LillyN

An eastward view of the new track alignment.

Guardrails4

June 8, 2007 – Guardrails added in the center of the new through truss bridge.

Shed1

New spur and freight shed at Lily