In the spring of ’13 an MOW crew replaced the old road bed and track at Peter’s Pond. Roadmaster, Gordon Bellamy oversaw the installation of the roadbed and track laying.
IPP&W Railway President, Fred Mills inspected the roadbed to ensure it meets railway standards.
Gord and Fred are still pondering the track alignment of a new industrial area south of the mainline, so the lead has not been connected yet.