Return to Track

Peter’s Pond

In the spring of ’13 an MOW crew replaced the old road bed and track at Peter’s Pond. Roadmaster, Gordon Bellamy oversaw the installation of the roadbed and track laying.

PetersPond1

IPP&W Railway President, Fred Mills inspected the roadbed to ensure it meets railway standards.

PetersPond2

Gord and Fred are still pondering the track alignment of a new industrial area south of the mainline, so the lead has not been connected yet.